How it works
- Starting a canary creates a hidden clone of the app (
<app>--canary) with the same environment variables and secrets, running the new image. It does not appear in the apps list and has no domains of its own. - Ingress splits each request between the app and the canary by weight (1 to 99 percent). The split is per request, not per user, so one visitor can see both releases. The split follows a repeating cycle of 100 requests, so a weight of 20 sends exactly 20 of every 100 requests to the canary. A handful of requests may all land on one release.
- A canary that is not running or not ready receives no traffic, so a bad image cannot take the app down. Weight 0 pauses the canary without removing it.
- Promote deploys the canary image to the app through the normal deploy path (readiness gate, rollback target, freeze and protection checks), then removes the clone.
- Abort, or deleting the app, removes the clone.
Staged canaries with automatic rollback
Give the canary a stage schedule and the control plane runs it for you. It sends the first share of traffic, watches the canary against the stable release, and either moves to the next stage, promotes at the end, or rolls the canary back.- Each stage observes the canary’s own requests (5xx rate and p95 latency from the edge request stats) and the stable release’s over the same window.
- The canary is rolled back, and the reason recorded, as soon as it has served
at least
APP_CANARY_MIN_REQUESTSrequests in the stage and its 5xx rate is more thanmax_error_rateabove the stable release’s, or its p95 latency is more thanmax_p95_ratiotimes the stable release’s (and aboveAPP_CANARY_P95_FLOOR_MS, so tiny latencies do not trip it). - A stage advances once its interval has passed with enough canary traffic. A canary that gets no traffic waits; it is never promoted unobserved.
- A stage of 100 means promote: the image is deployed to the app through the normal deploy path and the canary is removed. Promote now skips the rest.
- Weight 0 pauses a staged canary. Abort removes it.
- The state lives in the database and a reconciler converges on it every
APP_CANARY_TICK, so a control plane restart only reopens the current stage’s observation window. A failed rollback or promote is retried.
Defaults and per-app policy
Defaults come from environment variables on the control plane:
An app overrides them in
app.yaml. A deploy saves the block, and canary start without --weight then runs staged with it:
strategy: canary only saves this policy. The stable app still deploys
blue-green, and a canary starts when you start one (CLI, dashboard, API or MCP).
Limits
- One canary per app.
- Image apps only, with a single replica and no pinned host port. Apps built from source, stopped apps, and apps under a deploy freeze are refused.
- The canary has its own container and its own data connections. If the app writes to a database, the canary writes to it too.
CLI
status on a staged canary prints the stage, the canary and stable request
counts, error rates and p95, and what happens next. With the canary gone it
prints how the last one ended. All verbs take --json.
Dashboard
App, Deploys: the Canary release card has the image form. Fill in stages for a staged canary, or a traffic share for a manual one. A running staged canary shows a stage progress bar, the live error rate and p95 of the canary next to the stable release, and Promote now and Abort buttons. After a rollback the card says why.API
GET, POST, PUT and DELETE /api/v1/apps/{name}/canary, and
POST /api/v1/apps/{name}/canary/promote. All need the deploy ability, and
GET needs read. POST takes stages, interval, max_error_rate and
max_p95_ratio for a staged canary. GET returns the stage, the live
comparison and the last outcome. See the API reference.
MCP
get_canary reads the same status. start_canary, promote_canary and
abort_canary change state and are registered in full mode only.
Verified
Run on a real control plane with Docker and embedded Caddy: weights of 30 and 20 produced exactly 30 and 20 canary responses per 100 requests, weight 0 sent everything to the stable release, and promote left only the new image serving. A weight change reaches ingress within seconds. A new canary takes up to about 30 seconds to start its container.Troubleshooting
Cannot start a canary on this app
Likely cause: The app is built from source, has multiple replicas, a pinned host port, is stopped, or is under a deploy freeze. How to confirm: Runlevelrail-cli apps canary start <name> --image <image>. The error will state which limitation applies.
Fix: Canaries work only with prebuilt image apps. If the app is built from source, deploy the new image manually first (push to a registry, then deploy by tag). If it has multiple replicas, scale it to one. If it has a pinned host port, remove it first.
Canary is not receiving traffic
Likely cause: The canary container is not running or failed its readiness check, or the weight is set to 0. How to confirm: Runlevelrail-cli apps canary status <name> and check the canary app’s container status in the dashboard (it is named <app>--canary but not listed in the apps view).
Fix: Check the canary app’s logs with levelrail-cli apps logs <app>--canary -f for startup errors. If the image is bad, abort the canary and start a new one with a different image. If the weight is 0, increase it with levelrail-cli apps canary weight <name> --weight 10.
Promote gets stuck or times out
Likely cause: The canary image does not pass the readiness gate (same as a normal deploy), or there is a deploy freeze blocking it. How to confirm: Runlevelrail-cli apps deploys show <name> and check the failure details. Look for a deploy freeze in Settings > Deploy safety.
Fix: Check the canary image logs and fix any startup issues. If there is a deploy freeze, promote after the freeze window ends, or override it with a reason.
Still stuck
For help with a stuck canary deploy, check Deploy failures for the failure code, or runlevelrail-cli apps diagnose <name> and share its output.